Recore was brought in to reline a DN250 drain line at the base of Maraetai Dam, servicing one of the hydro-generators.
Recore was brought in to repair 20 problem areas across existing stormwater pipelines in Peacocke, with pipe sizes ranging from 300 mm to 600 mm.